Solar EPC for Garments & RMG Factories in Bangladesh
Plan rooftop solar around sewing lines, utilities and factory shifts. Compare electricity savings using your meter data, roof condition and buyer reporting requirements.
System Capacity: Site-specific | Savings Assessment: Modelled from bills | Payback Assessment: Calculated per project
Why Solar for Garments & RMG?
- Match factory shifts: Use interval demand, weekly closures and seasonal production to estimate how much solar the factory can consume on site.
- Prepare buyer evidence: Keep generation and purchased-electricity records for the reporting method your buyer actually requests. Confirm renewable-energy claims with the audit team.
- Plan around production: Check roof structure, fire access, cable routes and shutdown windows before agreeing the installation sequence.
- Compare relevant project scope: Vvon lists Akij Agro & Feed at 1,503 kWp and Ahad Jute Mills at 575 kWp. Ask for relevant project scope and references, then model your own factory.
Frequently Asked Questions
- How much can a garments factory save with solar? (গার্মেন্টস ফ্যাক্টরিতে সোলার প্যানেল লাগালে কত সাশ্রয় হয়?)
- Savings depend on the factory’s daytime demand, current bill, roof yield and proposed price. Share recent bills, operating shifts and roof drawings with the solar team at +8801805987890 for a scoped assessment. (সাশ্রয় নির্ভর করে দিনের লোড, বর্তমান বিল, ছাদ ও প্রকল্পমূল্যের ওপর। বিল, শিফট ও ছাদের তথ্য দিন।)
- How does solar help with LEED certification? (LEED সার্টিফিকেশনের জন্য সোলার কীভাবে সাহায্য করে?)
- Solar can contribute to an applicable LEED energy strategy, but points depend on the rating system, version and whole-building assessment. Ask your LEED consultant which evidence is needed; installation alone does not confer certification. (প্রযোজ্য LEED সংস্করণ ও পুরো ভবনের মূল্যায়ন অনুযায়ী অবদান নির্ধারিত হয়; শুধু সোলার লাগালেই সার্টিফিকেট হয় না।)
- Is rooftop solar safe for garments factory roofs? (গার্মেন্টস ফ্যাক্টরির ছাদে সোলার প্যানেল লাগানো কি নিরাপদ?)
- A competent structural assessment must establish whether the actual roof and fixings can accept the design loads. Fragile sheets, corrosion, roof warranties and safe maintenance access need review before installation. (ছাদের কাঠামো, ক্ষয়, সংযোগ ও নিরাপদ চলাচল পরীক্ষা করে নকশা করতে হবে।)
- How long does BPDB net-metering approval take? (নেট মিটারিং অনুমোদন পেতে কতদিন লাগে?)
- Use the relevant distribution utility’s current process and a complete application. The 2025 guideline specifies stages, but actual scheduling depends on documents, corrections, inspection and metering; a single end-to-end approval duration is not assured. (সম্পূর্ণ আবেদন, সংশোধন, পরিদর্শন ও মিটারিং অনুযায়ী সময় নির্ধারিত হয়।)
Discuss a Solar Feasibility Study
Contact Vvon Technologies at +8801805987890 or info@vvon.com.bd to discuss a site survey and feasibility study. Utility coordination and applicable approvals are defined for each project.